Farmington Hills Addition
Posted in: Additions, Cement Siding, Ceramic Tile, Concrete Flat Work, Crown Molding and Custom Trim, Electrical, Heating and Cooling, Interior and Exterior Door Replacement, Landscaping, Masonry Walls and Footings, New Home Construction, Painting, Plumbing, Projects, Vinyl Siding, Window Replacement by admin on January 26, 2011 | No Comments
A five year plan came to life when this 1,400 sq ft addition was completed. All of the family’s needs were satisfied with a mud room with lockers, grand kitchen, oversized bedrooms, and bonus room above the garage.
Before:
After:
Egress Window
Posted in: Renovations, Window Replacement by admin on | No Comments
Egress windows are made to allow for finished space below grade. Any basement that will be used for anything more than storage must have one. It allows an escape during a fire. We use top quality products that will stand up to the sub-grade conditions. This project is best to do before finishing that basement.
Before:
After: